Project Summary
The removal of water, oil and sludge that had been contaminated with low level PCBs from 7 mostly underground pits in a waste water treatment plant in use for a manufacturing plant.
The customer required extreme attention to detail throughout project which included many logs of waste vessels associated to different areas of the plant which all had to be sampled individually before classification for shipment.