Project Summary
ERG came in during plant holiday shutdown and dug out a press pit with three feet of scrap metal coin, blanks and matrix pieces so that maintenance could get in and fix the chute. The material was heavy, sharp and oily. The scrap had nested in upon itself so it could not be easily removed. They had a short window to work with as the presses normally run 24 / 7 making automotive parts. There was limited space so we could not use heavy equipment.