Stamping Plant Scrap Conveyor Cleaning

Project Summary

ERG came in during plant holiday shutdown and dug out a press pit with three feet of scrap metal coin, blanks and matrix pieces so that maintenance could get in and fix the chute. The material was heavy, sharp and oily. The scrap had nested in upon itself so it could not be easily removed. They had a short window to work with as the presses normally run 24 / 7 making automotive parts. There was limited space so we could not use heavy equipment.

Company: An Automotive Stamping Plant
Category: Industrial Services / Site Remediation
Location: Mid Michigan
Focus: Removal of scrap steel burying the basement due to the scrap chute breaking.

Project Tasks

The customer had tried numerous methods to remove the pile with limited success. ERG attacked the pile with fresh bodies and know how to remove it.

Project Control

ERG has trained professionals that can perform a variety of projects.