Project Summary
During Fall 2005 a major oil release from a TSCA-regulated PCB transformer (>100,000 ppm PCBs) occurred within the concentrating area of an iron ore processing facility, impacting four (4) levels of interior conveyor lines, flooring, stairways, catwalks, walls, lighting fixtures, piping, cables, electrical components, etc.
- ERG worked 24/7 for six (6) continuous months to achieve decontamination of the facility to below TSCA-regulated criteria
- Impacted structures and surfaces were decontaminated to TSCA levels or removed for off-site treatment/ disposal
- Work performance was complicated by winter weather conditions in Northern Michigan, challenging ERG to employ “outside-of-the-box” solutions to complete the complicated project tasks.