PCB Decontamination of Water Treatment Plant

Project Summary

ERG took on a project for a bearing manufacturer that has operated in same 1 million square foot facility since the early 1900s.

Company: Bearing Manufacturer
Category: PCB Decontamination
Location: Ohio
Focus: The Client had a release of material from inside plant that had contaminated all parts of water treatment plant including outside holding tanks, inside ASTs and USTs as well as piping and floors of entire plant.

Project Tasks

We utilized a confined space crew with vac truck to power wash, clean all areas and remove waste to central tank farm for removal. Starting with the highest elevations of plant and working our way down.
We systematically moved through plant on a specific schedule with daily meetings on progress, needs and timeframes.

Project Control

ERG provided OSHA, Hazwoper, fork truck and portable lift training for employees.
Confined space permits and air monitoring units were used during the project.