Project Summary
- ERG was retained to engineer, procure and construct required elements of DTE’s SPCC plans for 20+ Class C Electrical Substations located throughout the greater Detroit area
- Measures were installed pursuant to EPA’s latest SPCC regulations for oil-filled equipment within and around the substations
- DTE substations included herein require SPCC compliance as the typical substation has an aggregate fuel in equipment/oil volume which exceeds the SPCC’s regulatory maximum 1,320 gallon storage limit for tanks which could discharge oil into or upon US navigable waters or adjoining shorelines in the event of a catastrophic release.